Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle

Product Details
Customization: Available
Customized: Customized
Certification: ISO14001, ISO/TS16949, ISO9001
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 30 days
ODM Services
The supplier provides ODM services
to see all verified strength labels (15)
  • Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
  • Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
  • Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
  • Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
  • Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
  • Railway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
Find Similar Products

Basic Info.

Model NO.
18-100
Type
Train Wagon
Transport Package
Export Package
Specification
18-100
Trademark
Guardx
Origin
China
HS Code
8607990000
Production Capacity
500000/PCS

Product Description

Our Certifications and Features :
1.American "AAR" Certification;

2.Russian Certification;

3.Ukrainen Certification;

4. German "V" modeling technology;

Side frame - one of the main structural elements of the bogie framework of the model 18-100. It is manufactured by casting, with additional machining and riveting of wear-resistant plates. Side frame, drawing No.100.00.002-4SB, represents a major piece of a freight wagon bogie, which transmits the load on the axle through the axle box. Cast alloy steels 20GFL and 20GL.

Bolster drawing No.100.00.001-6 serves as a bridge between the two side frames in the construction of a freight wagon bogie.To ensure reliability and durability the bolster is casted from steel 20GFL or 20GL.One of the main frame details of a bogies framework model No.18-100. Set lifetime of a bogie frame before a bolster discarding is 30 years. The designated lifetime up to the first depot repair is 2 years, before the first overhaul is 8 years. Established time to failure is at least 2 years.

Overall dimension:

side frame:2.41m*680cm*56cm weight:400kg

bolster:2.61m*39.5cm*47cm weight:525kg
 

Forging Part

Train wagon bogie

 

Material

ER6,ER7,ER8,ER9,R7T,R8T,R9T,CL60

Dimension

According to your drawings

Application

Heavy industrial equipment

Inspection

Chemical composition; UT,MT; mechanical property; dimension check

Standard

IRS,BS,UIC,AAR,BN,GB,TB/T,EN

QC Doc

Chemical composition report mechanical properties report; UT test report; heat treatment report; dimensions check report.

Forging Processing

Ingot---forging---heat-treatment---rough machining---UT.MT---Q+T---inspection---finishing machining---UT.MT---packing

Heat Treatment

Normalized / Annealed / Quenched / tempered

Railway Bogie Bolster & Frame for Metro/Subway/Undergroud VehicleRailway Bogie Bolster & Frame for Metro/Subway/Undergroud VehicleRailway Bogie Bolster & Frame for Metro/Subway/Undergroud VehicleRailway Bogie Bolster & Frame for Metro/Subway/Undergroud Vehicle
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier